Epos-France - GPSMob data from the mission n°18-150 in Pyrénées (2018).Responsibles: Philippe Vernant. Mission started on 2018-06-14 and ended on 2018-06-22. Data were measured on 15 points. The data for each mission is organized in several subdirectories: (i) raw: contains what has been identified as raw data, if ever provided; (ii) rinex: contains the rinex files, possibly split by day, renamed in lower case and with the most likely point name, in d.Z format; (iii) meta: contains all other files (calculation configuration files, field logs, photos, etc.) The automatic verification procedure generates station.info.insu and compte_rendu_de_traitement_insu.txt files.