The current document forms a gazetteer of buildings recorded related to the Newbury Parkway Development. The majority of the buildings within the archaeological buildings programme (thirty-six) were intended for demolition but a number of these either adjoined or formed part of a building which was to be retained. Two of the buildings were to be refurbished after adjoining parts of them were demolished In addition to investigation and recording of the standing buildings, further recording was made of significant buildings during their demolition by way of Watching Briefs and the resulting information incorporated into the final report. The current document forms a gazetteer of buildings recorded related to the Newbury Parkway Development as part of a wider programme of archaeological works. The Parkway Development is the result of a collaboration between Standard Life Investments Ltd, Shearer Property Group and West Berkshire Council. Planning permission was granted, conditional upon a programme of archaeological building investigation and recording and below-ground archaeology and this report relates to the archaeological buildings programme