A scheme of works were carried out over winter 2012/2013 which entailed the creation of a new north doorway (essential for disabled access to the building; entry by the south door entails a series of steps), the formation of a service duct within the north aisle and the creation of a new drain following the pathway on the north side of the church. The affected area of the north wall was recorded in detail, and groundworks monitored