An archaeological watching brief was undertaken north of the strip, map and sample excavation conducted by SCAU in 2014. The purpose of the watching brief was to observe the removal of a number of trees to accommodate the northern aspect of the main school building. Clearly a number of trees had been removed without observation, however seven of the trees were observed during their removal. No archaeological features or finds were observed.