Between the 11th and 15th of February 2019 OA East carried out a trial trench evaluation on land to the east of Pentney Quarry, Norfolk. This work was carried out in preparation for the future expansion of the quarry. A total of thirty-seven 30m trenches were excavated. A total of nine possible ditches and gullies were identified along with a large number of periglacial and other natural features. No finds were recovered from any of these features.