Archaeological watching brief undertaken in accordance with a planning condition to monitor the groundwork in association with the construction of anew building to be used as an ICT suite. The watching brief monitored the ground reduction to formation level for the proposed new building and the breaking out of the exposed concrete slab in the areas where 8 piling were excavated. No archaeological finds or features were identified within the archaeological investigations.