A trial trench evaluation undertaken in advance of a side extension to the existing nursery with playground areas, staff and visitors' parking and KS1 playground, a year six block to the rear of the grounds, and multi-use games area (MUGA) and basketball court with a KS2 playground (Planning Reference DC/22/1709/FUL), between 30th of January and 2nd of February 2023. Three trenches were excavated to provide a representative sample of those areas of the site likely to be impacted by groundworks in the Phase 1 of the development, North Area (year 6 block and KS2 playground only. No archaeological features or finds were present in any of the trenches. Modern made ground, between 0.30-0.40 m thick, made of modern gardening soil, occupational debris and mixed soils, was present across the site, overlaying directly the natural geology. This report details the results of a trial trench evaluation undertaken in advance of a side extension to the existing nursery with playground areas, staff and visitors' parking and KS1 playground, a year six block to the rear of the grounds, and multi-use games area (MUGA) and basketball court with a KS2 playground (Planning Reference DC/22/1709/FUL), between 30th of January and 2nd of February 2023. Three trenches were excavated to provide a representative sample of those areas of the site likely to be impacted by groundworks in the Phase 1 of the development, North Area (year 6 block and KS2 playground only. No archaeological features or finds were present in any of the trenches. Modern made ground, between 0.30-0.40 m thick, made of modern gardening soil, occupational debris and mixed soils, was present across the site, overlaying directly the natural geology.