The site was excavated using the SMS methodology which entailed the removal of the current topsoil at a depth of 0.3m to a colluvial deposit beneath. Due to the low impact of the construction works it was decided that the colluvial deposit could remain in situ, as it would protect any archaeological remains beneath. Imported material would then build up above the colluvial layer. No archaeological remains were encountered.