Following completion of the main body of work, some opportunities for design optimisation were explored.These were:combining two trains of CCGT into one capture unit,reducing the assumed reboiler duty on the stripper,reducing the specification of the amine thermal recovery unit andreducing compression requirements.This Technical Note describes the outcome of these in terms of the impact of design, performance and cost.