This deliverable is number 2 of 2 in Work Package 2 and presents the results of the technology testing programme carried out by the consortium.The report presents the results from the testing carried out within the project into the anaerobic digestion and thermal processing of selected waste feeds, and the results from preliminary combustion engine trials with simulated fuel gases, arising from these processes. This deliverable together with D1.3 from Work Package 1 provides a key input into the Energy from Waste system modelling work carried out in Work Package 3.