- A network of 29 short-period data cubes was installed to densify the IMO network.
- Network was installed to extend the SO297 experiment onshore
- Installation time: February 2023 - June 2023
- Cruise report of RV SO297 cruise (offshore experiments): https://doi.org/10.48433/cr_so297